• Chuffed_Canadian@alien.topB
    link
    fedilink
    English
    arrow-up
    1
    ·
    1 year ago

    Low hanging fruit: ditch the dumb switches and get a 48 port or something. Place it on the shelf above. If you’re using the two switches to ensure that you have more throughput per machine considering putting in a 10gbit uplink. Beyond that consider mounting/stacking the monitors differently and changing out the wood shelves for metal shelves for airflow. The trick is to know in which direction they dissipate heat. If they’re fanless the heat is gonna go up which will limit your ability to stack.